TEVOS

Inward Quality Engineer (Iqc)

Intangles · Pune, MH, India

Lead Verified source Salary not disclosed

Posted 23 Oct 2026 (first seen by Tevos)
Last confirmed 26 Oct 2026 (last seen by Tevos)

Apply on Intangles site ↗

Job description

Role & responsibilities
Inward Inspection

  • Incoming inspection of SMT components (marking, purchase order, supplier invoice, actual part verification, value if applicable, and packaging condition).
  • Incoming inspection of local components such as plastic casing, battery, harness, packaging box, hardware, screws, etc.
  • Fill the incoming inspection checklist and update the store material inward sheet after inspection. Add a QC sticker to each box.
  • Verify the supplier PDI report and maintain records of all supplier PDI reports.
  • Perform 100% inspection of OBD cables for the international market using a test bed/multimeter.
  • Perform 100% verification of all pigtails (splitter, 9-pin, etc.) for continuity and visual defects using a tester, multimeter, or visual inspection.
  • Conduct sampling inspection after pre-assembly.

Inward Material Rejection

  • Update the rejection summary supplier-wise and material-wise in the rejection sheet for any rejected material.
  • Calculate supplier PPM and prepare monthly trends supplier-wise and material-wise for actual tracking and audit purposes.
  • Send an email to the supplier regarding any inward material rejection.
  • Obtain an 8D report from the supplier for every rejected material.
  • Visit the supplier's premises if parts are rejected due to major issues, for improvement activities, or for trials, if required.
  • Maintain records of inward rework and material on hold.
  • Segregate incoming material supplier-wise or internally in case of urgency.
  • Send monthly performance reports to every supplier.

Incoming Process Documents

  • Prepare and update all incoming master checklists as required.
  • Prepare and update the sampling plan.
  • Ensure that drawings for all inward materials are available.

Improvements

  • Initiate Kaizen activities whenever possible.
  • Initiate corrective actions for incoming material issues whenever possible.

Store

  • Monitor whether the store follows the FIFO (First In, First Out) system.
  • Ensure that a FIFO sticker is affixed to each box.

Others

  • Fill out the deviation report, if applicable.
  • Fill out the engineering change document, if applicable.

Packaging List

  • Verify the packaging list against the batch material.
  • Ensure that all parts listed in the packaging list are available and included in the BOM and alternate sheets.
  • Update the packaging list after material verification.

In-house Hardware Changes

  • Perform 100% verification of the PCBA after in-house hardware changes.
  • Add a sticker/signature after verification.

Source: Intangles careers page, collected by Tevos on 26 Oct 2026; verify details on the employer site. Tevos does not take applications — the Apply button opens the employer’s own page.

Apply on Intangles site ↗